Environmental Health & Safety |
|
|||||
|
Lockout/Tagout
Periodic Inspection Form |
|
|
||||||||||||||||||||
|
Note: The inspector must be trained in Lockout / Tagout procedures and be an authorized employee as defined in the Lockout / Tagout procedures. |
||||||||||||||||||||
|
| 1. EQUIPMENT OR DEVICE CONTROLLED (name, manufacturer, model, serial #, etc): |
|||||||||||||||||
|
|||||||||||||||||
| 2. EMPLOYEE(S) INTERVIEWED: | |||||||||||||||||
|
|||||||||||||||||
|
3. ARE ENERGY CONTROL PROCEDURES BEING FOLLOWED? (Ask employee to describe the procedure.)
|
|||||||||||||||||
| |||||||||||||||||
| 4. LOCKOUT AND TAGOUT DEVICES: | |||||||||||||||||
|
|||||||||||||||||
| 5. EMPLOYEE CONDUCTING INSPECTION: | |||||||||||||||||
|
|||||||||||||||||
|
6. ENVIRONMENTAL HEALTH AND SAFETY HAS REVIEWED THIS DOCUMENT AND APPROVED THE CONTROL OF HAZARDOUS ENERGY (Lockout / Tagout) PERIODIC INSPECTION. |
|||||||||||||||||
| Signature: ________________________________________ | Date: ___________ | ||||||||||||||||
| Step 1: Before Beginning to Service Equipment |
Yes
|
No
|
N/A
|
|
|
|
Have the type and amount of energy source(s) on the equipment been identified? |
|
|
|
|
|
Have the possible dangers related to the energy source being controlled been identified? |
|
|
|
|
|
Are the steps necessary to control the energy source understood? |
|
|
|
|
|
Have all affected employees been notified when the equipment will be shut down for service? |
|
|
|
| Step 2: Shut Down Equipment |
Yes
|
No
|
N/A
|
|
|
|
Have the company & RSQUO's Safety Procedures been followed? |
|
|
|
|
|
Have the manufacturer & RSQUO's Instructions been referred to? |
|
|
|
| Step 3: Isolate the Machine or Equipment |
Yes
|
No
|
N/A
|
|
|
|
Has the main breaker or control switch been shut off? |
|
|
|
|
|
Have the valves been closed? |
|
|
|
|
|
Have process lines been disconnected? |
|
|
|
| Step 4: Attach Lock and Tag |
Yes
|
No
|
N/A
|
|
|
|
Have the lock and tag been attached? |
|
|
|
| Step 5: Control Stored Energy |
Yes
|
No
|
N/A
|
|
|
|
Has the electrical capacitance been bled? |
|
|
|
|
|
Have the pressure or hydraulic lines from the work area been vented or isolated? |
|
|
|
|
|
Have tanks been drained? |
|
|
|
|
|
Are switches or levers that could be moved into the start position blocked, clamped, or chained? |
|
|
|
|
|
Are lines containing process materials that are toxic, hot, cold, corrosive, or asphyxiating cleared? |
|
|
|
| Step 6: Verify That the Energy State is at Zero |
Yes
|
No
|
N/A
|
|
|
|
Have the start switches on the equipment been tested? |
|
|
|
|
|
Have the pressure gauges been checked to insure that lines are depressurized? |
|
|
|
|
|
Are blocks or cribs secure? |
|
|
|
|
|
Have electrical circuits been checked to verify that voltage is at zero energy? |
|
|
|
|
|
Are blanks, used to block feed chemicals, secure, and not leaking |
|
|
|
|
Step 7: If you have answered yes (or N/A) to the above steps, then the correct procedures are being followed. If not, describe the corrective actions taken:
|